Hill Electric Company
San Antonio, Texas
December 2005
Richard Dennehy works for Hill Electric Company. We asked him a few questions about the company's decision to purchase Design Master Electrical. He also gave us an update on how Design Master Electrical is working for him.
DM: Describe Hill Electric and the type of work that you do.
We are a new electrical contracting company that just opened our doors for
business in July of 2005. Our core team of five worked together at
another company for quite a few years. When our supervisor, the vice-president in charge of the division, decided to open his own business
we all asked the same question: "When do we start?" One of the team members
worked for the old company for over thirty-two years, having
started while still in high school. I was there for seventeen years and
was giving retirement serious consideration since I have been in the
electrical construction since 1958. The other team members' tenure range
from eight to thirty years. We have been together as a team for about
twelve years. All of us have such a tremendous respect for our owner that we
could not wait to assist him. He has always encompassed the team concept of
operation which is why we were the most profitable of the seven divisions of
the other company. We are targeting the service and small commercial
construction arena ($15,000 to $300,000), since this was our forte at the
other company.
DM: How long did it take for you to become proficient with the software?
RD: I wouldn't really call myself "proficient" with the software. I believe
that the fact that the system is so "user-friendly" is what makes it seem so
easy.
DM: What features of the software are most useful to you?
RD: I use to develop my panel schedules, fixture schedules, load
calculations in Excel and Word and then import them into my CAD drawings.
When (not if) the architect started making changes, I would go
back and make the changes in the various schedules and re-import them.
The features of the software eliminate this.
DM: How do you feel that Design Master differs from other engineering or CAD software?
RD: The number one difference is cost. Most of the other programs are over-priced. Also, some
of these programs seem to require a degree in physics to be able to use.
DM: Can you describe a situation where Design Master has made your job easier?
RD: It normally takes me anywhere from forty to sixty man-hours to prepare
and print CAD drawings, including fixture schedules, panel schedules, load calculation, etc., for a two story building. I then print them so that I can review them
for errors. If there are any errors I may have to redo the load calculations,
fixture schedule, riser diagram, or feeder schedule. This takes me
anywhere from six to ten man-hours.
Using Design Master, I did a three story
project over the Thanksgiving weekend. It took me less than sixteen
man-hours to have the drawings ready for printing. After the review, it took
me less than three hours to have all the errors corrected and ready for
final printing.
DM: Do you see the industry using these types of design tools more often in the future?
RD: I have always considered myself basically an electrician. I only have a
high school education and have had no formal training in computers or
AutoCAD. I have basically taught myself. Design Master is so
"user-friendly" anyone can utilize it.
To be cost effective in this day and
age, you have to use everything available. I can remember when I first
started estimating and design work I had to sit with pencil and template to
draw each receptacle, light switch, light fixture, each circuit loop, each
panel, each motor, etc.. With Design Master it is now basically "point and
click". My father always told me the smart man finds the easy way to do his
job and that the smart man is the one who will keep his job. And he quit
school in the seventh grade.
Unless you want to be left behind, you have to avail yourself of every aid
that will make you more efficient and productive.
|